Details

Architect B720
Developer
AEFE
Builder CONSTRUCCIONES PEREZ VILLORA
Location BARCELONA
Cost 4.455.000 €
Area 4.580 m2
Design 2015
Construction
2016 – 2017

Description

The nursery school, “Lycée Français” of Barcelona is located in the Munner street.

The project includes the demolition of all buildings except the main Villa where small structural interventions are planned such as a concrete layer on the ground floor and some metal profiles to increase the spans of the doors thus facilitating communication between spaces. In addition, a new building will be built contiguous to the existing one it will have a basement and three storeys.

The storeys structures consist of steel columns and beams connected with a composite slab.

The basement structure is made with a conventional system of concrete beams and slabs to ensure enough stiffness to allow the removal of some columns in the upper floors.