Details

Architect PMMT
Developer MINISTERIO DE SALUD ESTADO PLURINACIONAL DE BOLIVIA
Builder MAKIBER
Location MONTERO (BOLIVIA)
Cost 34.278.100 €
Area 23.500 m²
Design 2017
Construction 2017 – 2018

Description

The new Hospital is located in the town of Montero, Obispo Santistevan province, Santa Cruz department, Bolivia.

The plot is mainly composed by different buildings separated by large outdoor courtyards despite the continuous façade contour.

For the foundation the technical proposal that is proposed in the project is the construction of deep foundations with displacement piles in situ.

The structure is essentially made with reinforced concrete, with columns and walls for the vertical structure and bidirectional ribbed slabs (with beams in some cases) for the horizontal structure. That is, the structure is conceived with low ductility class.
For the ribbed slabs, a system with lost lightening moulds made of foam have been recommended to reduce the self weight.

Related Projects