Details

Architect AMB
Developer CASTELLDEFELS TOWN HALL
Builder CONSTRUCCIONES PÉREZ VILLORA S.A.
Location CASTELLDEFELS
Cost 2.000.000 €
Area 1.300 m2
Design 2015
Construction 2016

Description

The project consists on the expansion of the school CEIP Josep Guinovart located in the town of Castelldefels. It is a rectangular building of two floors above ground intended for school uses (classrooms among others). The plan dimensions are 58,4×12,4m.

The structure is mostly prefabricated with prefabricated hollow core slabs of 20 + 5 cm thickness, simply supported on prefabricated reinforced concrete beams, which are also simply supported on prefabricated reinforced concrete columns.

The connection between the existing building and the new building is a steel footbridge (independent of the buildings structure) that will connect the two buildings on the first floor. This structure is build with steel HEB profiles (which form the main structure) and IPE profiles (beams on the floor and ceiling).

The foundation was designed with piles of 45 cm diameter.

Related Projects